SRO Trainees (or existing SROs) needed for the restart of what will be the state-of-the-art restart of TMI/Crane Clean Energy Center in Pennsylvania. Don’t miss out on being part of this groundbreaking initiative!
Total compensation of $159-182K, including:
- Target 15% annual incentive bonus
- Sign On Bonus
- $10K in milestone bonuses, throughout training
- After SRO License obtain, total compensation goes to $191K
- Comprehensive benefits, 401K with employer match, employee stock purchase plan, paid holidays/vacation/sick time
- Relocation provided
Minimum Qualifications:
- High School Diploma or equivalent
- Meet or exceed one of the following:
- 1-year Reactor Operator license at a PWR facility or 1.5 years at a BWR facility.
- 1.5 years or more (after qualification) in a position equivalent to Reactor Operator (or Supervisor) at military reactor (i.e., Power Plant Watch Engineer, Engineering Watch Supervisor, Reactor Operator, Engineering Officer of the Watch, Propulsion Plant Watch Supervisor).
- BS degree in engineering, engineering technology or physical sciences, and more 1.5 years+ as a qualified non-licensed operator or a supervisor or manager in work control, operations, engineering, outage management, maintenance, radiation protection, chemistry, or accredited training at a PWR nuclear plant. Managerial, staff engineer, or supervisor experience at BWR plant may be credited on a 1.5:1.0 basis and 3 years required for a non-traditional degree.
- Successfully pass pre-employment testing (Plant Operator Selection System, Math/Science Test and FLS Leadership Assessment)
Job Summary while in training to obtain an NRC License:The initial license trainee will combine classroom instruction, simulator training, and on-the-job experience to acquire the essential skills and knowledge to meet the qualifications for a Senior Reactor Operator License holder. Upon completion of the qualification, the candidate will be fully licensed by the NRC to supervise the operations of the reactor control room.
- Completion of Fundamentals Phase, completion of Simulator Certification, acquiring SRO status, attainment of NRC SRO License (80%)
- Study time, field time needed to attain licensed status (10%)
- Project work, outage assignments, or duties as assigned to support the site operations (10%)
Job Summary after training:Provide direct oversight of Constellation’s Nuclear Power Generating Station operations, including directing Reactor Operators in controlling plant operations, Equipment Operators in field operations, procedure use, and tagging evolutions.
#D650
#LI-KJ1